The swimming pool underwent a massive refurbishment over the summer break.
The refurb included: decorating the pool hall and changing rooms, as well as a new resin floor in each room, the total value of these works were £32,000.
The renovation of the pool, coincided with other works around the school, including: improving ventilation, removal of old flooring, décor and filtration plant upgrades.
Ian Barnes, Operations Director said:
“The renovation works over the summer have made a valuable improvement to the swimming pool hall and changing rooms.”
In the coming month’s added work will include a pool cover and energy management controls.